Post-construction and pre-handover cleaning
Post-construction cleaning gets a new or refurbished production building, warehouse or office ready for handover and for its first working day: it removes construction dust, residues of mortar, paint and adhesives, and protective films. We arrive on site within 24 hours with a team and equipment. We sweep, wash and seal floors, and deep-clean windows and doors, washrooms and welfare cabins. If needed, we work on site around the clock to finish before handover.
At a glance
- We work 365 days a year, around the clock.
- We hold a Floor Protection Contractor Certificate.
- In an emergency, we increase staffing on site within 24 hours.
- We carry out post-construction cleaning regularly — in production buildings, warehouses and office areas, before handover and before staff move in.
- We arrive on site within 24 hours with a team and equipment.
- We sweep, wash and seal floors, and deep-clean windows and doors, washrooms and welfare cabins.
- If needed, we work on site around the clock to finish before handover.
- Among other projects, we cleaned a construction site at an MLP logistics park.
Who it is for
- Main contractors and clients building production and warehouse facilities, ahead of handover.
- Logistics park developers handing a building over to a tenant.
- Tenants getting ready to move staff, racking and machines into a new building.
- Plants after modernisation, an extension or a refurbishment of office and staff areas.
What post-construction cleaning covers
On an industrial floor, post-construction cleaning matters for technical reasons: cement dust and mortar residues under forklift wheels act like sandpaper on a fresh surface. Deep cleaning and sealing the floor before operations start costs less than putting it right after the first months of traffic.
- Removing construction dust from floors, structures, windowsills and building services.
- Removing residues of mortar, paint, silicone and adhesives.
- Removing protective films and stickers.
- Cleaning windows, doors, industrial doors and rooflights.
- Sweeping and machine cleaning of floors, followed by sealing.
- Getting washrooms, staff rooms and welfare cabins ready for use.
Three stages of cleaning on a construction site
On a large construction site, cleaning happens more than once. The most common mistake is to order a single clean just before handover — the team then has to remove several months’ worth of dust in one go, and every finishing touch-up after cleaning means more dust on a clean floor.
For industrial buildings, splitting the work into three stages works well, each with a different purpose and scope. It is worth agreeing the schedule with the site manager so that the final clean takes place after all finishing work is complete, but before racking and machines are brought in.
| Stage | When | Scope |
|---|---|---|
| Rough clean | During finishing works | Clearing rubble and packaging into the client’s skips, sweeping, keeping walkways clear |
| Builders’ clean | When construction work is complete | Dust from structures and building services, mortar and paint residues, protective films, cleaning windows and industrial doors |
| Sparkle clean (final pre-handover clean) | Before handover or before staff move in | Machine cleaning and sealing of floors, washrooms, staff rooms, final check |
After handover: ongoing cleaning
Post-construction cleaning ends on the day of handover, but the building has to be looked after from the first shift. A contractor that got the building ready for handover knows its floors, building services and problem spots — and can propose an ongoing cleaning schedule straight away.
Construction waste — rubble, packaging, leftover materials — remains the responsibility of the client or the main contractor as its holder. During cleaning, it is gathered into skips ordered by the waste holder.
- After the builders’ clean, we offer ongoing cleaning of the building — with a team that has known it from day one.
Checklist: what to ask a contractor
Questions worth asking any cleaning company before you sign a contract, whoever you choose.
- How soon can the contractor get on site, and with what team?
- Can the team work nights and weekends if the handover date requires it?
- Does the scope include sealing the floor after cleaning, or only cleaning it?
- Who is responsible for construction waste skips and their collection?
- Who signs off the work on the client’s side, and against what checklist?
Sites and figures
Preparing UTAL’s new production building for handover
For main contractor DEMOCO, we prepared UTAL’s new production building for handover: the office block, and the glazing and floors of the two-storey production area.
ViewPreparing sites for handover for main contractor WPIP
As a subcontractor to WPIP, we prepared an InPost distribution centre, a Dramers production building in Rabowice and Piła Retail Park for handover.
ViewFrom our work
How soon can you get on site?
We arrive on site within 24 hours with a team and equipment.
Do you work nights and weekends to finish before handover?
Yes. We work 365 days a year, around the clock, and if needed we work on site around the clock to finish before handover.
Do you also clean washrooms and welfare cabins on site?
Yes. We sweep, wash and seal floors, and deep-clean windows and doors, washrooms and welfare cabins.
How much does post-construction cleaning cost?
We prepare a quote after a site survey — the price depends on the floor area, how dirty the site is, the height to be cleaned, the number of stages and the handover date.
What happens to construction waste after cleaning?
The holder of construction waste is the client or the main contractor. During cleaning we gather it into skips, and on request we also arrange its collection by a waste contractor registered in BDO (Poland’s national waste database register).
Often ordered together
Floor deep cleaning
Deep cleaning of factory and warehouse floors: tyre marks, oil, ground-in dust. Greater Poland, Lubusz and Lower Silesia. In 2025 we deep-cleaned 66,890 m² of floors.
Details Industrial floorsConcrete floor sealing
Sealing and polymer coating of concrete floors in factories and warehouses: less dusting, no stains soaking in. Floor Protection Contractor Certificate, BUZIL chemicals.
Details Contract cleaningIntegrated cleaning services
Contract cleaning of plants and logistics centres: buildings, offices, grounds, consumables. Two contract managers per client, 92% of revenue from long-term contracts.
Details Contract cleaningWarehouse cleaning
Warehouse cleaning without stopping dispatch: forklift tyre marks, dust on high-bay racking, loading bays. 470,500 m² of floor space under ongoing contracts.
Details Contract cleaningOffice cleaning
Regular cleaning of offices, office buildings and plant office areas: workstations, washrooms, kitchens, windows, consumables. 14,370 m² of offices under contract.
DetailsIndustries
Ask AI about your site
The AI assistant will read this page and the calculator, ask you about the scope you need (“Post-construction and pre-handover cleaning”) and then, one question at a time, about your site — floor area, floor type, shifts, waste and site requirements. Finally, it will prepare a ready-to-send request for quotation with a list of open points.
- ChatGPT opens with a ready-made prompt (new tab)
- Claude opens with a ready-made prompt (new tab)
- Perplexity opens with a ready-made prompt (new tab)
Show the prompt
Help me prepare a request for quotation for industrial cleaning — topic: Post-construction and pre-handover cleaning. First open and read these pages of the contractor SARA SYSTEM. Open them directly; do not rely on search results alone: - https://www.sarasystem.pl/en/services/post-construction-cleaning/ - https://www.sarasystem.pl/en/cost-calculator/ - https://www.sarasystem.pl/llms.txt Then interview me briefly about my site. Ask one question at a time, in English, and wait for my answer. Start by asking what exactly I need in terms of “Post-construction and pre-handover cleaning”, then ask about the type of site and its floor area. Then ask in turn about: 1. the type of site and its floor area, 2. the floor type: bare, power-floated, sealed, painted or resin-coated concrete, 3. the soiling: tyre marks, oil, dust, old coatings, 4. the height of the building and the racking, 5. the number of shifts and whether the site keeps operating while the work is done, 6. how often the work is needed, 7. the scope: machine cleaning, high-level surfaces, washrooms, loading bays, 8. waste, 9. health and safety requirements, public liability insurance and site standards, 10. who provides the machines and chemicals, 11. the start date. If I don't know something, record it as an open question. About SARA SYSTEM, write only what is on these pages — do not add anything. Whatever the pages do not say, add to the questions for the contractor. If the calculator gives indicative costs, quote them as an estimate together with its assumptions. Finally, write a ready-to-send email with the request to SARA SYSTEM (biuro@sarasystem.pl): the site parameters as bullet points and a list of open questions.
The conversation takes place in the tool you choose — we have no access to it. The assistant can make mistakes, so it is worth confirming the details with us directly.
A site survey as early as the same or the next day
We will come and look at your floors and zones, then prepare a work plan with a quote.