Preparing sites for handover for main contractor WPIP
Commissioned by WPIP, a main contractor based in Poznań, we prepared three sites for handover: an InPost distribution centre, another production building for Dramers S.A. in Rabowice, and Piła Retail Park on ul. Zygmunta Starego. At the retail park, with an area of almost 3,000 m², the scope covered general cleaning, glazing cleaning and floor protection.
Project details
Commissioned by: Main contractor WPIP of Poznań — SARA SYSTEM worked as a subcontractor.
InPost distribution centre: Preparing the InPost distribution centre for handover.
Dramers building in Rabowice: Preparing another Dramers S.A. production building in Rabowice for handover.
Piła Retail Park: A new retail park on ul. Zygmunta Starego in Piła, with an area of almost 3,000 m².
Scope of work in Piła: General cleaning, glazing cleaning and floor protection.