Service area: western Poland — Greater Poland, Lubusz, Lower Silesia 24/7 call-outs +48 509 017 710 biuro@sarasystem.pl
Case study

Post-construction deep cleaning and polymer floor coating at the SEVEN Polska warehouse

In December 2018, at the high-bay warehouse of the SEVEN Polska wholesale centre in Murowana Goślina, we carried out finishing work on a new industrial floor: post-construction deep cleaning and a polymer coating. The work was commissioned by the floor contractor, BUD-BAU. The industrial concrete floor had a mineral dry-shake topping in a darker shade.

Project details

Site: The high-bay warehouse at the wholesale centre of SEVEN Polska — a manufacturer and distributor of children’s products.
Client: SEVEN Polska.
Commissioned by: BUD-BAU — the contractor that laid the industrial floor in this warehouse.
Scope of work: Post-construction deep cleaning and polymer floor coating.
Floor type: Good-quality industrial concrete with a mineral dry-shake topping in a darker shade.
Visual result: Thanks to a good concrete mix and the darker topping, the floor looked better after the polymer coating than we had expected.
Location: Murowana Goślina.
Date: December 2018.

From our work

A dark, mirror-like floor in an empty warehouse reflecting the structural columns and walls
Floor in the SEVEN Polska warehouse after polymer coating, December 2018
A warehouse floor split in two: light and matt before the work on the left, dark and glossy after polymer coating on the right
The line between before and after polymer coating

A site survey as early as the same or the next day

We will come and look at your floors and zones, then prepare a work plan with a quote.