Case study

Cleaning a CCC logistics centre and office building

For CCC, we cleaned a new logistics centre — buildings with automated sorters, and mezzanines with conveyors and racking — as well as the entire office building. In a site like this, cleaning has to be coordinated with the installations: a large machine cannot get under sorters and conveyors, and dust settles on the parts that goods travel along.

Project details

Site: CCC’s new logistics centre with automated sorters and conveyors, and an office building.
Client: CCC.
Scope of work: Cleaning the logistics centre buildings and the entire office building.
Year: 2019.

From our work

A new logistics centre: a long sorter with black chutes running the length of the building, with boxes and assembly parts in the foreground
Sorter at the new CCC logistics centre
A long row of sorter chutes in a new, empty logistics centre building
Logistics centre before start-up
A multi-level mezzanine with yellow railings and roller conveyors in a logistics centre
Mezzanine with conveyors in a logistics centre